PROJECT
CONTROLSVIEW
100% GROUNDED
โšก ZERO-HALLUCINATION PROJECT CONTROLS INTELLIGENCE

High-Stakes Capital Programs.
100% Auditable Math. Zero Guesswork.

The commercial copilot engineered for Project Controls Directors and Planners. Instantly reconcile EVM S-curves, identify margin fade drivers against tender baselines, and verify every number down to contract purchase orders.

ยฃ1.4B+ Capital Program Value Monitored
0.0% Hallucination Tolerance
100% Clickable Derivations
<250ms Reconciled EVM Derivation
ControlsView Cockpit ยท MED-101 Riverside (Live Interactive Sandbox)
โ— 100% RECONCILED Data-as-of: Jun 2026
LIVE BREACH MED-101 ยท Riverside Hospital
Test the sensitivity engine: adjust delay days to simulate real-time margin fade.
Simulate Subcontractor Schedule Delay: 12 Days
0d (Baseline) +$30,000 site prelims 45d (Max Shock)
FORECAST EAC
$1,255,000
MARGIN %
-4.6%
VARIANCE (VAC)
-$55,000
Cumulative S-Curve Telemetry CPI: 0.89 ยท SPI: 0.92
BAC $1.2M DATA DATE
-- Planned Value (PV) - Earned Value (EV) - Actual Cost (AC)
Portfolio Health Radar 3 Active

Enterprise Capital Portfolio Rollup

3 Active Programs 100% Grounded
Consolidated Earned Value Management, cost variance drivers, and Primavera P6 schedule float exposure across active contracts.
Total Portfolio Budget (BAC)
$81,300,000
3 Primary Capital Baselines
Aggregate Earned Value (EV)
$64,950,000
79.9% Physical Progress
Aggregate Actual Cost (AC)
$62,400,000
Cost Variance: +$2.55M (Ahead)
Weighted Portfolio CPI
1.04
$1.04 earned per $1 spent
Weighted Portfolio SPI
0.74 โš ๏ธ
Critical drag in MED-101 (0.48)
Enterprise Forecast EAC
$81,325,000
VAC: -$25,000 breach
Cross-Project Governance Comparison Matrix
Multi-project audit reconciliation down to Work Breakdown Structure & Purchase Orders
Sorted by Risk Exposure
Project Code & Name Contract BAC Committed Actual Spent Earned (EV) Margin % CPI SPI P6 Float Package Risk Status Action
MED-101
Riverside Medical Pavilion
$48,200,000 $48,000,000 $36,750,000 $37,100,000 0.5% (Fade -14%) 1.01 0.48 ๐Ÿšจ -12 Days 3 overruns ($85k) CRITICAL
LIB-310
Civic Library Reconstruction
$11,600,000 $11,450,000 $8,250,000 $8,700,000 5.4% (Target 6.2%) 1.06 0.94 +4 Days 0 overruns WATCH
LOG-204
East Coast Logistics Hub
$21,500,000 $20,900,000 $17,400,000 $19,150,000 8.6% (+1.4% gain) 1.09 1.02 +18 Days 0 overruns HEALTHY
PORTFOLIO TOTALS
3 Enterprise Contracts
$81,300,000 $80,350,000 $62,400,000 $64,950,000 3.8% avg 1.04 0.74 -12d max 3 overruns WATCH
Enterprise Capital Allocation $81.3M Total BAC
โ–  MED-101: 59.3% ($48.2M) โ–  LOG-204: 26.4% ($21.5M) โ–  LIB-310: 14.3% ($11.6M)
Capital commitments are heavily weighted to MED-101 Riverside Medical Pavilion (59.3% of portfolio). Subcontractor compensation claims on MED-101 represent the primary group margin risk.
Commercial Variation Notices & Dispute Ledger $175,000 Logged Claims
MED-101 ยท Apex Mechanical Ductwork Delay Claim
P6 Activity ACT-104 (-12d float breach)
+$45,000
MED-101 ยท Severfield Structural Steel Frame Variation
CBS-04 Scope Change Order
+$40,000
LIB-310 ยท Glazing Package Supply Chain Notice
CBS-05 Faรงade lead time shock
+$20,000
โšก Executive Portfolio Queries: ๐Ÿ“Š Portfolio Margin Fade โšก Highest Schedule Risk ๐Ÿšจ Enterprise Over-Budget Packages โš–๏ธ Cross-Project Indices ๐ŸŽฏ Rank Portfolio by Risk
Quick Scenarios: ๐Ÿ“‰ Riverside Margin โš ๏ธ Margin Fade Driver ๐Ÿšจ Over-Budget Packages โš–๏ธ SPI & CPI Metrics ๐ŸŽฏ Rank by Risk ๐Ÿ›ก๏ธ Policy Refusal Test
Baseline Budget (BAC)
$1,200,000
Earned Value (EV / BCWP)
$550,000
Actual Cost (AC / ACWP)
$618,000
Cost Variance (CV)
-$68,000
Schedule Variance (SV)
-$70,000
Current CPI / SPI
0.89 / 0.92
Cumulative EVM Performance Curve (MED-101)
Reconciled against Oracle Primavera P6 schedule baseline & CBS cost ledger
Planned (PV)
Earned (EV)
Actual Spent (AC)
Forecast (EAC)
$1.2M $900k $600k $300k $0 DATA DATE (JUN 2026) EAC: $1.225M (+$25k breach) M1 (Jan) M3 (Mar) M5 (May) M6 (Current) M8 (Aug) M10 (Oct) M12 (Dec)
TIMELINE SCRUBBER:
Month 6: Planned $620k ยท Spent $618k
Deterministic What-If Sensitivity Engine
Parametric stress-testing: assess margin erosion, forecast EAC, and package risk exposure.
1. Parametric Shock Controls
Subcontractor Schedule Slip 0 Days
Prelims impact: $2,500/day +$0 prelims
Unresolved Compensation Claims $0
Early contractor disputes, MEP variation notices, and ground claims
Uncommitted Cost Escalation 0%
Applies to remaining uncommitted structural & MEP package budgets
2. Real-Time Sensitivity Outcome
โœ“ BASELINE PERFORMANCE 0.0% Margin Fade
Forecast EAC
$1,225,000
Baseline: $1.225M
Variance at Completion (VAC)
-$25,000
BAC: $1.200M
Projected Margin %
-2.1%
Planned: 14.5%
Simulated CPI
0.89
Cost efficiency
CBS Package Risk Allocation
PackageBudgetForecastStatus
Primavera P6 Critical Path Float Degradation Radar
Parsed directly from schedule_MED-101.xer: detects float consumption before milestones slip.
2 Critical (< 0d) 2 Vulnerable (0-10d) 2 Stable (> 10d)
Activity ID Description Early Start Early Finish Total Float Linked CBS Package Subcontractor Action
ACT-104 MEP 1st Fix Ductwork & Containment 15-Jul-2026 27-Jul-2026 -12 Days (Breach) CBS-07 MEP Sub Apex Mechanical Inspect โ†—
ACT-108 Substation Commissioning & Energization 02-Aug-2026 10-Aug-2026 -8 Days (Breach) CBS-07 MEP Sub Apex Mechanical Inspect โ†—
ACT-102 Structural Steel Frame Level 3-4 10-Jun-2026 14-Jun-2026 +4 Days (Vulnerable) CBS-04 Steel Frame Severfield UK Inspect โ†—
ACT-106 External Envelope & Unitized Glazing 28-Jun-2026 05-Jul-2026 +7 Days (Vulnerable) CBS-05 Faรงade Permasteelisa Inspect โ†—
ACT-110 Internal Drylining & Acoustic Partitions 12-Aug-2026 28-Aug-2026 +22 Days (Healthy) CBS-09 Fitout Balfour Interiors Inspect โ†—
ACT-115 Hard Landscaping & Access Roads 01-Sep-2026 15-Oct-2026 +38 Days (Healthy) CBS-11 Civils Tarmac Infrastructure Inspect โ†—
5-Lever Margin Waterfall Reconciliation (CVR)
Conservation Law Verified โœ“
Deterministic Cost-Value Reconciliation: attributing exact profit movements across Scope, Buyout, Site Productivity, and Commercial Claims.
Visual Waterfall Bridge (Tender Baseline โž” Current Forecast Margin)
Total Pillar Margin Gain (+ฮ”) Margin Loss (-ฮ”)
Root Cause Attribution & Audit Trail 100% Deterministic (Zero Rounding Leak)
Waterfall Lever Category Starting Margin Lever Movement (ฮ”) Resulting Position Root-Cause Driver & Commentary Audit
๐Ÿ” Derivation & Provenance
๐Ÿ“
No Citation Selected
Click any interactive citation pill [C1] in the analysis stage to inspect its formula derivation, CBS ledger sources, and cryptographic audit hash.
How ControlsView Grounded Controls Operates
From raw Primavera P6 and ERP CSV ingestion to zero-hallucination executive briefs.
Workflow Pipeline โ€ข Phase 1 of 5
Interactive Workflow Architecture
Watch the 5-phase deterministic data pipeline transform raw schedules into auditable executive controls.
1
Phase 1
Ingest & Pre-Flight
P6 XER, CBS CSV, & XML parsed with confidence scoring.
2
Phase 2
Deterministic EVM
0% drift computation of BCWP, ACWP, CPI, SPI, and EAC.
3
Phase 3
Grounded Synthesis
Natural language with 100% clickable [C1, C2] claim keys.
4
Phase 4
Merkle Provenance
SHA-256 cryptographic chain and SOC 2 audit trail.
5
Phase 5
Executive Cockpit
Instant CVR reconciliation, telemetry radar, and briefs.
Interactive How-To Playbooks
Step-by-step operational workflows for Commercial Directors and Planners.
Interactive Guides
How to Intercept Subcontract Margin Erosion Before Invoices Land
Compare committed purchase orders against tender baseline allowances across all CBS packages.
1 Select Monitored Project
In the Portfolio Radar, click on MED-101 (Riverside Hospital) to observe the red critical RAG badge.
Select: MED-101 (Margin: -12.4%)
2 Submit Grounded Query
Ask: "Explain the margin fade and package overruns on MED-101". The EVM engine computes committed overruns.
Query: Margin variance & overruns
3 Inspect Clickable [C1] Pill
Click citation [C1] to open the Derivation Drawer showing the formula, source CBS rows, and exact breach amounts.
Derivation: Earned Value - Actual Cost
How to Generate an Executive CVR Brief in Under 60 Seconds
Replace weeks of manual Excel rollups with mathematically reconciled executive briefs.
1 Select Capital Scheme
Select LIB-310 (Civic Library Wing) with ยฃ1.8M budget and 100% healthy delivery metrics.
Project: LIB-310 (CPI: 1.05, SPI: 1.01)
2 One-Click Brief Button
Click "๐Ÿ“‹ Executive Brief" in the top-right of the Cockpit Stage to trigger the deterministic briefing generator.
Endpoint: GET /report?project=LIB-310
3 Export Audit Package
Click "Export Audit CSV" to download the complete SHA-256 hash-chained ledger for board approval.
Download: audit_trail.csv
How to Ingest Primavera P6 Schedules and ERP Cost Ledgers
Drag-and-drop ingestion with automatic pre-flight confidence scoring and open-end logic detection.
1 Launch Ingestion Studio
Click "๐Ÿ“ฅ Ingestion Studio" in the top navigation header or use the left-pane upload button.
Modal: Ingestion & Quality Studio
2 Drop CSV or P6 XER
Drop your 9-column CBS cost ledger or paste Primavera P6 %T/ACTIVITY schedule tables.
Formats: .CSV, .XER, .XML
3 Inspect Quality Score
The pre-flight engine verifies row counts, valid currency codes, and sets the confidence meter before seeding.
Pre-Flight: 100% Quality Score
How the Zero-Hallucination Policy Engine Blocks Speculation
Guaranteed compliance: ungrounded questions are politely and firmly refused with explicit boundaries.
1 Ask Speculative Query
Ask: "Will the price of structural steel drop next quarter?" (a market speculation outside ledger facts).
Input: Commodity market prediction
2 Policy Interceptor Triggers
The grounding contract verifies that no verified CBS records contain forward commodity market trends.
Status: CONTRACT_REFUSAL_TRIGGERED
3 Deterministic Safe Guard
Returns a polite refusal citing specific ledger boundaries, preventing false executive forecasts.
Output: Zero Hallucination Guarantee
Engineered for High-Stakes Capital Delivery
Why Commercial Directors, Planners, and PMs replace static spreadsheets with ControlsView.
๐Ÿ“‰
Instant Margin Fade Detection
Detect margin erosion against tender baseline the moment subcontract commitments exceed allowances, before invoices land.
โฑ๏ธ
CVR Reconciled in Seconds
Eliminate 2 to 3 weeks of manual month-end Cost-Value Reconciliation spreadsheets with instantaneous, auditable rollups.
๐Ÿ›ก๏ธ
100% Clickable Grounding
Every single number, percentage, and index in every response is clickable to its mathematical formula and purchase order lineage.
โš–๏ธ
Integrated Cost & Schedule
Cross-reference Primavera P6 critical path activities directly against CBS committed expenditure packages for complete EVM visibility.
๐Ÿ”’
Enterprise RLS & Data Residency
True multi-tenant PostgreSQL Row-Level Security ensures joint ventures and subcontractors only see their authorized program scope.
๐Ÿ“‹
One-Click Executive Briefs
Download verified Markdown briefs and RFC 4180 audit CSVs directly into your executive board reporting packs.
Traditional Project Controls vs. ControlsView Enterprise Platform
The fundamental shift from brittle spreadsheets to a deterministic, cryptographically proven controls system.
Capability / Metric Traditional Controls & Spreadsheets ControlsView Grounded Controls Platform
Month-End CVR Cycle Time โœ— 14 to 21 days of manual consolidation โœ“ < 60 seconds deterministic rollup
Data Hallucination Risk โœ— High with generic LLMs / human copy-paste โœ“ 0.0% โ€” Enforced policy refusal engine
Number Provenance โœ— Broken Excel VLOOKUPs, lost PO lineage โœ“ 100% Clickable [C1, C2] formula derivations
Cost & Schedule Integration โœ— Disconnected P6 schedules & ERP ledgers โœ“ Correlated CBS package & critical path logic
Audit & Compliance Trail โœ— Version chaos (CVR_Final_v3_edit.xlsx) โœ“ SHA-256 Merkle hash chain, RFC 4180 export
Subcontractor Multi-Tenancy โœ— Accidental leak of confidential commercial margins โœ“ Hardware-isolated PostgreSQL Row-Level Security
Proven Across Mission-Critical Capital Delivery Sectors
๐Ÿฅ ยฃ480M Program
Healthcare Mega-Hospital
Detected ยฃ1.2M mechanical & electrical subcontract package drift at 38% completion, preventing dispute and saving 6 weeks of claims litigation.
๐Ÿš„ ยฃ1.2B Joint Venture
High-Speed Rail & Transit
Reconciled 14 joint venture subcontract accounts across 4 tiers of suppliers, compressing monthly reporting turnaround from 18 days to 2 hours.
โšก ยฃ320M Build
Hyperscale Data Center
Correlated Primavera P6 critical path generator deliveries directly against CBS supplier payment schedules for real-time delay mitigation.
Transparent Enterprise Pricing
Scales from single mega-projects to global capital program portfolios.
Project Pilot
ยฃ0 / pilot
Ideal for evaluating ControlsView on a single project with demo or sample cost & schedule data.
  • โœ“ 1 Active Capital Project
  • โœ“ Full Tri-Pane Cockpit access
  • โœ“ 9-column Cost CSV parsing
  • โœ“ Clickable derivation inspector
  • โœ“ 30 daily grounded queries
Enterprise Sovereign
Custom / portfolio
Dedicated single-tenant or VPC deployment for Tier-1 contractors and infrastructure owners.
  • โœ“ Unlimited Projects & Users
  • โœ“ Dedicated Postgres + RLS instance
  • โœ“ Native SAP / Oracle Aconex Connectors
  • โœ“ SSO (Okta, Entra ID, SAML 2.0)
  • โœ“ SOC 2 Type II Compliance pack
  • โœ“ 24/7 Dedicated Controls Engineer SLA
Granular Plan Feature Matrix
Compare technical capabilities across delivery tiers.
Platform Feature Project Pilot Commercial Cockpit Enterprise Sovereign
Max Active Projects 1 Project Up to 10 Projects Unlimited Enterprise-Wide
Supported Ingestion Formats 9-Column Cost CSV CSV, Primavera P6 (.xer), MS Project (.xml) CSV, XER, XML, SAP S/4HANA, Aconex
Grounded Derivation Inspector โœ“ Included โœ“ Included โœ“ Included
EVM S-Curve Telemetry Basic Full Multi-period Sparklines Portfolio-wide EVM Aggregation
Cryptographic Provenance Session SHA-256 Persistent SHA-256 Merkle Chain HSM-Signed Immutable Ledger
Data Isolation & Tenancy In-Memory Sandboxed Multi-tenant Cloud with RLS Dedicated Single-Tenant VPC / On-Prem
SLA & Technical Support Community 8ร—5 Controls Specialist 24ร—7 1-Hour SLA + Dedicated Engineer
Frequently Asked Questions
๐Ÿ”’ Does our financial or schedule data train external AI models?
No, absolutely never. ControlsView operates a zero-data-retention policy for AI model providers. All calculations are executed on deterministic local or customer-isolated PostgreSQL instances with Row-Level Security.
๐Ÿ“ How does ControlsView guarantee zero mathematical hallucinations?
ControlsView separates calculation from natural language synthesis. All EVM metrics (CPI, SPI, EAC, Margin) are calculated in strict floating-point-safe math cores. The AI is only permitted to reference verified, tagged claim keys.
๐Ÿ“ What versions of Primavera P6 are supported?
ControlsView natively parses Primavera P6 XER exports from versions 8.x through 24.x, extracting %T/PROJECT, %T/WBS, and %T/TASK records directly in the browser and server.
๐Ÿข Can ControlsView be deployed in air-gapped defense or GovCloud environments?
Yes. Enterprise Sovereign licenses support complete air-gapped deployments on AWS GovCloud, Azure Government, or private on-premises Kubernetes clusters.